More information:

Mannheimer, C. 2010. Vegetation Studies for Proposed Sendelingsdrif Mine and Associated Infrastructure. September 2010


Description:

The river terraces at Sendelingsdrif, which lie within Namdeb's Orange River Mining Licence harbour a potentially economically viable deposit of diamonds. Consideration is being given to mining these deposits.

Summary / Notes:

The greater area concerned falls into the northern section of the Succulent Karoo Biome, which is regarded as a global biodiversity hotspot (Myers et al 2000), and is thus important in global as well as regional and national terms. This makes only absolutely unavoidable damage acceptable. It is extremely sensitive in terms of near-endemic, endemic and protected plant and animal species. Approximately 16% of the Namibian flora as a whole is thought to consist of endemic species (Craven & Vorster 2006), and over 30% of plants that occur in the Namibian section of the Desert Biome are believed to be endemic to that area.

Year: 2010

Type: Report

Origin: CSIR

Download: Namdeb ORM LOM - Vegetation Assessment.pdf (4.26 mb)

Preview: Preview this file


Top 50 related results:

You may also be interested in the following items which are on a similar or related topic, listed in order of similarity.

Results per page:

Results: 1 to 50 of 50

To FILTER: Use the pale green row to filter the results on this page. Type in text or select from the year list.

Rows matching filter(s): All
What is this row? 
Data titleYearOriginFile typeDownloadkml/kmz
Government Gazette of the Republic of Namibia, No. 4878, 6 February 2012. Government Notices: No. 28: Commencement of the Environmental Management Act, 2007, page 1
  » More info & related results
2012Government GazetteLegal (Act, Gazette, Policy)492 kb pdf
Preview
Mannheimer, C.A. 2008. Goanikontes Uranium Project, Vegetation study. pp. 30
  » More info & related results
2008 Report
Pallett, J., Brown, C.J. and Mannheimer, C.A. 2009. Etango Project Environmental Impact Assessment: Vegetation, vertebrates and terrestrial ecology. pp.70
  » More info & related results
2009 Report
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix I: Biodiversity studies - Phase II Invertebrate Study of Langer Heinrich Uranium Mining Licence Area (ML 140)
  » More info & related results
2009 Report2.25 mb pdf
Preview
Environmental Impact Assessment and Environmental Management Plan of Orange River Life of Mines Extension Project, Sendelingsdrif. Appendix B, Previous environmental studies. Draft Scoping Report, July 2010
  » More info & related results
2010CSIRAppendix426 kb pdf
Preview
Environmental Impact Assessment and Environmental Management Plan of Orange River Life of Mines Extension Project, Sendelingsdrif. Appendix G, Minutes of meetings during the Scoping Process. Final Scoping Report, March 2011
  » More info & related results
2011CSIRAppendix267 kb pdf
Preview
Environmental Impact Assessment and Environmental Management Plan of Orange River Life of Mines Extension Project, Sendelingsdrif. Appendix I, Issues Trail from the Scoping Process. Final Scoping Report, July 2010 page I
  » More info & related results
2011CSIRAppendix180 kb pdf
Preview
Sendelingsdrift Mine Restoration Plan, Adaptive Management System Framework, September 2010
  » More info & related results
2010CSIRReport
Environmental Impact Assessment and Environmental Management Plan of Orange River Life of Mines Extension Project, Sendelingsdrif. Appendix F, Correspondence to I&APs. Draft Scoping Report, July 2010
  » More info & related results
2010CSIRAppendix1.16 mb pdf
Preview
Environmental Impact Assessment and Environmental Management Plan of Orange River Life of Mines Extension Project, Sendelingsdrif. Project description. Draft Scoping Report, December 2010
  » More info & related results
2010CSIRReport1.36 mb pdf
Preview
Mannheimer, C.A. 2006. Environmental impact assessment of the Trekkopje Uranium Project, Specialist contribution: Vegetation. pp. 22
  » More info & related results
2006 Report
Burke, A. 2009. Biotope assessment for Areva Resources Namibia's Trekkopje Mine in the central Namib Desert. pp. 31
  » More info & related results
2009 Report
A. Speiser Environmental Consultants. 2008. Scoping Report, Social and Environmental Impact Assessment of the proposed Uranium Mine 'Etango Project' near Swakopmund. pp.118
  » More info & related results
2008 Report
Irish, J. 2008. Report on a desktop study concerning the invertebrates of area EPL 3345, specifically the Etango Project Area. pp. 38
  » More info & related results
2008 Report
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix H: Soil and Land Capability Study - Specialist soils and land capability studies
  » More info & related results
2009 Report3.74 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix I: Biodiversity Studies - Vegetation Impact Assessment for the proposed expansion project at Langer Heinrich Uranium (Pty) Ltd
  » More info & related results
2009 Report16.46 mb pdf
Preview
Ekotrust. 2010. Vegetation of the Inca, Tubas and Shiyela sites of Reptile Uranium Namibia (RUN). pp. 100
  » More info & related results
2010 Report9.87 mb pdf
Preview
Brett, R. 2009. Review of the Biodiversity Assessment at Rössing Uranium, Namibia
  » More info & related results
2009 Report9.85 mb pdf
Preview
B2Gold Namibia. 2016. Otjikoto Gold Mine: Hazardous waste management plan - June 2016
  » More info & related results
2016 Report1.36 mb pdf
Preview
Strohbach, M. 2012. Biodiversity Studies at Langer Heinrich Uranium Mine, Phase 2: Biodiversity Description of the MI140 and Epl 3500 as Baseline for Future Planning - Vegetation Map and Description (June 2009). Dinteria, 32: 5-51
  » More info & related results
2012Namibia Scientific SocietyJournal Article3.37 mb pdf
Preview
Lalkhan, M.J. 2007. Radiation Baseline Survey, Trekkopje, Namibia. pp. 13
  » More info & related results
2007 Report
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix I: Biodiversity Studies - Phase-2 environmentla baseline study of vertebrates in mining licence area 140 (ML140) of the Langer Heinrich Uranium Mine
  » More info & related results
2009 Report1.99 mb pdf
Preview
Müller, S. 2007. Social and Environmental Impact Assessment of Rössing Mine Expansion Projects - Water Management. pp. 22
  » More info & related results
2007 Report
Ninham Shand. 2007. Social and Environmental Impact Assessment: Proposed Expansion Project for Rössing Uranium Mine in Namibia: Phase 1 - Acid Plant, Ore Sorter & SK4 Pit, Scoping Report
  » More info & related results
2007 Report2.41 mb pdf
Preview
Burmeister and Partners. 2010. Traffic Impact Assessment, Rio Tinto Rösing Uranium Limited. pp. 291
  » More info & related results
2010 Report
Metago Environmental Engineers. 2009. Environmental Scoping Report for the proposed Rossing South Uranium Mine. pp. 64
  » More info & related results
2009 Report
Metago Environmental Engineers. 2011. Environmental Impact Assessment Report for the Husab Mine Linear Infrastructure. pp. 224
  » More info & related results
2011 Report
Government Gazette of the Republic of Namibia, No. 564, 31 December 1992. Government Notice, No. 199: Promulgation of Minerals (Prospecting and Mining) Act, 1992 (Act 33 1 of 1992), of the National Assembly, page 1-195
  » More info & related results
1992Government GazetteLegal (Act, Gazette, Policy)425 kb pdf
Preview
Rogers, J. and Li, K.C. 2002. Environmental impact of diamond mining on continental shelf sediments off southern Namibia. Quaternary International, 92(1): 101–112
  » More info & related results
2002 Journal Article
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Chapters 4-10
  » More info & related results
2009 Report14.55 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section A - Introduction and Environmental Management Framework
  » More info & related results
2009 Report3.26 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section B - Management and Mitigation Plans (MMPS)
  » More info & related results
2009 Report1.51 mb pdf
Preview
Limpitlaw, D., Hoadley, M., Leathley, B. and Macpherson, I. 2007. Managing Social and Environmental Risks and Opportunities in a New Uranium Mine: The Case of UraMin's Trekkopje Project in Namibia. Presented at the SAIMM Colloquium: Uranium in Namibia,Safari Hotel, Windhoek, 14-16 May, 2007
  » More info & related results
2007 Report375 kb pdf
Preview
African Conservation Services cc. 2015. Social and Environmental Impact Assessment for Rössing Uranium's Proposed Desalination Plant near Swakopmund: Baseline Report: Bird assessment - Additional study: Monitoring of Damara Terns at Mile 4 Salt Works, summer 2014/2015
  » More info & related results
2015 Report1.36 mb pdf
Preview
Aurecon. 2011. Social and Environmental Impact Assessment Phase 2b: Proposed Expansion of Rössing Uranium Mine, Final Report
  » More info & related results
2011 Report134.64 mb zip
Japp, D. 2012. Environmental Impact Assessment Report - Dredging of marine phosphates from ML 170. Appendix 1a: Marine Benthic Specialist Study for a Proposed Development of Phosphate Deposits in the Sandpiper Phosphate Licence Area off the Coast of Central Namibia - Fish and Fisheries
  » More info & related results
2012 Report4.51 mb pdf
Preview
Carter, R. 2012. Environmental Impact Assessment Report - Dredging of marine phosphates from ML 170. Appendix 1b: Marine Benthic Specialist Study for a Proposed Development of Phosphate Deposits in the Sandpiper Phosphate Licence Area off the Coast of Central Namibia - Water Column
  » More info & related results
2012 Report2.22 mb pdf
Preview
McClurg, T.P. 2014. Specialist Study, Section C2.6 - A survey of Epifauna in the Sandpiper- 1 (SP-1) target phosphate dredging area on the central Namibian continental shelf. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report3.02 mb pdf
Preview
Weston, L. and Carter, R. 2014. Specialist Study, Section C2.7 - A Survey of Plankton. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report1.89 mb pdf
Preview
Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report3.15 mb pdf
Preview
Munnik, K. and Carter, R. 2014. 1.1 - Project execution plan: Verification Survey MV DP Star. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 1 - 1.0 Water column and sedimentary environment. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2013 Report1.15 mb pdf
Preview
Capricorn Fisheries Monitoring. 2014. 2.2 - Cruise Report Biodiversity Survey FV Zeearend. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 2 - Fisheries and biodiversity. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report1.34 mb pdf
Preview
Lwandle Technologies. 2014. 2.3 - CTD Deployment Report FV Zeearend. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 2 - Fisheries and biodiversity. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.43 mb pdf
Preview
Steffani, N. 2014. B1.3 - Verified assessment of impacts: Macrofauna. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section B: Impact Assessment Varification. Volume 1, Main Report, pages 56-72. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report914 kb pdf
Preview
Gibbons, M. 2014. B1.4 - Verified assessment of impacts: Jellyfish. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section B: Impact Assessment Varification. Volume 1, Main Report, pages 72-82. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report839 kb pdf
Preview
Midgley, J. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2012 Report1.44 mb pdf
Preview
Midgley, J. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Chapter 3 - Project description
  » More info & related results
2012 Report3.29 mb pdf
Preview
B2Gold. 2017. Environmental Management - Otjikoto Gold Mine. Presentation at Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Presentation4.4 mb pptx
2017. Selection of photos. Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Photos2.95 mb zip
Lambert, J. 2016. A Life Cycle Assessment of a Uranium Mine in Namibia. M.Sc Degree, Department of Civil and Environmental Engineering, College of Engineering, University of South Florida
  » More info & related results
2016 Thesis5.72 mb pdf
Preview

» Links to useful free software for working with shapefiles, kml and kmz files, pdf files and more.