More information:

A. Speiser Environmental Consultants. 2017. Environmental scoping report for the amendment to the hazardous waste management plan at B2Gold Otjikoto Gold Mine


Description:

Environmental scoping report for the amendment to the hazardous waste management plan at B2Gold Otjikoto Gold Mine.

Summary / Notes:

The scoping report will cover the proposed change to the Otjikoto Gold Mine waste management to destroy disposable hazardous waste on site by means of incineration. As this method of waste treatment, incineration was regarded as the best practical option for addressing the safe disposal of hazardous waste at Otjikoto mine. The waste management plan has been updated accordingly.

Year: 2017

Type: Report

Download: Hazardous waste management plan at B2Gold Otjikoto Gold Mine.pdf (4.65 mb)

Preview: Preview this file


Top 50 related results:

You may also be interested in the following items which are on a similar or related topic, listed in order of similarity.

Results per page:

Results: 1 to 50 of 50

To FILTER: Use the pale green row to filter the results on this page. Type in text or select from the year list.

Rows matching filter(s): All
What is this row? 
Data titleYearOriginFile typeDownloadkml/kmz
B2Gold Namibia. 2016. Otjikoto Gold Mine: Hazardous waste management plan - June 2016
  » More info & related results
2016 Report1.36 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix P: Tailings Study - Conceptual planning and design of tailings storage facilities for stage 3
  » More info & related results
2009 Report7.93 mb pdf
Preview
B2Gold. 2017. Exploration and Environment. Presentation at Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Presentation1.55 mb pptx
Ellmies, R., Hikumuah, M., Ndalulilwa, K. and Schneider, G. 2011. The strategic environmental management plan for the central Namib uranium province. In: Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011, pp 18-21
  » More info & related results
2011 Report4.06 mb pdf
Preview
Kamona, F., Mapani, B., Kříbek, B., Majer, V., Pašava, J,. Pecina, J., Sibanda, F., Amkongo, A., Ellmies, R., Macoun, J. and Keder, J. 2011. Environmental-geochemical survey results in the Rosh Pinah Region, Namibia. In: Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011, pp 23
  » More info & related results
2011 Report83 kb pdf
Preview
Leonard, R.N., Hauptfleisch, M. and Ellmies, R. 2011. An Artisanal Mining Environmental Code of Practice for Namibia. In: Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011, pp 40-42
  » More info & related results
2011 Report176 kb pdf
Preview
Mapani, B.S., Uugulu, S., Hahn, R.L., Ellmies, R., Mwananawa, N., Amaambo, W. and Schneider, G. 2011. Results of urine and blood from residents around the Copper Smelter Complex, Tsumeb, Namibia: An example of anthropogenic contamination. In: Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011, pp 48-50
  » More info & related results
2011 Report1.14 mb pdf
Preview
Ndalulilwa, K., Haidula, A., Leonard, R. and Ellmies, R. 2011. Risk assessment of abandoned mine sites in Namibia. In: Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011, pp 52-53
  » More info & related results
2011 Report186 kb pdf
Preview
Kribek, B. (ed). 2011. Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011
  » More info & related results
2011 Report9.21 mb pdf
Preview
Government Gazette of the Republic of Namibia, No. 4878, 6 February 2012. Government Notices: No. 28: Commencement of the Environmental Management Act, 2007, page 1
  » More info & related results
2012Government GazetteLegal (Act, Gazette, Policy)492 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Chapters 4-10
  » More info & related results
2009 Report14.55 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix B: Public involvement database
  » More info & related results
2009 Report123 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix C: Information sharing with IAPS
  » More info & related results
2009 Report20.36 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix D: Summary of issues raised by authorities and IAPS
  » More info & related results
2009 Report85 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section C - Monitoring Plan
  » More info & related results
2009 Report821 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich
  » More info & related results
2009 Report92 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Executive Summary
  » More info & related results
2009 Report294 kb pdf
Preview
Steffani, N. 2008. Marine baseline study on the potential impacts of a seawater intake structure and a brine disposal system for a proposed desalination plant north of Swakopmund. Draft
  » More info & related results
2008 Report14.94 mb doc
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure E: Final Social and Environmental Management Plan
  » More info & related results
2014 Report4.48 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D8: Shoreline dynamics study - Beach and Shoreline Dynamics Specialist Study and Impact Assessment
  » More info & related results
2014 Report1.7 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D6: Marine ecology impact assessment - Marine Ecology Specialist Study
  » More info & related results
2014 Report3.49 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D5: Avifauna impact assessment - Specialist assessment report: Birds
  » More info & related results
2014 Report3.06 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D4: Noise impact assessment - Noise Impact Assessment for Rössing Uranium's Proposed Desalination Plant near Swakopmund - Environmental Noise Impact Assessment
  » More info & related results
2014 Report4.74 mb pdf
Preview
SAIEA. 2009. Trekkopje Uranium Project - Environmental and social impact assessment
  » More info & related results
2009 Report2.12 mb pdf
Preview
Ellmies, R. 2009. Strategic Environmental, Social and Economic Assessment for the Central Namib Uranium Rush
  » More info & related results
2009 Presentation9.42 mb pdf
Preview
Softchem. 2011. Environmental Impact Assessment Report for the Inca Project
  » More info & related results
2011 Report44.15 mb zip
Softchem. 2011. Environmental Impact Assessment Report for the Tubas Project
  » More info & related results
2011 Report47.29 mb zip
Softchem. 2011. Environmental Impact Assessment Report for the Shiyela Iron Project
  » More info & related results
2011 Report44.7 mb zip
Namibian Marine Phosphate (Pty) Ltd. 2012. Environmental Impact Assessment Report - Dredging of marine phosphates from ML 170. Appendix 1: Specialist Consultant Reports
  » More info & related results
2012 Report657 kb pdf
Preview
Japp, D. 2012. Environmental Impact Assessment Report - Dredging of marine phosphates from ML 170. Appendix 1a: Marine Benthic Specialist Study for a Proposed Development of Phosphate Deposits in the Sandpiper Phosphate Licence Area off the Coast of Central Namibia - Fish and Fisheries
  » More info & related results
2012 Report4.51 mb pdf
Preview
van Ballegooyen, R.C. 2014. Review: The utility of hydrodynamic and biochemical numerical modelling to better inform potential water column and benthic impacts of proposed dredging of marine phosphates in Mining Licence Area ML 170, Namibia. CSIR Report. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.28 mb pdf
Preview
Kirby, B. 2014. Specialist Study, Section C2.3 - Thiobacteria. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report333 kb pdf
Preview
McClurg, T.P. 2014. Specialist Study, Section C2.6 - A survey of Epifauna in the Sandpiper- 1 (SP-1) target phosphate dredging area on the central Namibian continental shelf. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report3.02 mb pdf
Preview
Carter, R. and Munnik, K. 2014. Specialist Study, Section C2.1 - Water Column and Sediments. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report12.68 mb pdf
Preview
Glossary. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report599 kb pdf
Preview
Metocean Services International. 2014. 1.8 - Instrument Mooring Report: Day 0 to 45. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 1 - 1.0 Water column and sedimentary environment. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.98 mb pdf
Preview
Metocean Services International. 2014. 1.9 - Instrument Mooring Report: Day 45 to 90. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 1 - 1.0 Water column and sedimentary environment. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report4.49 mb pdf
Preview
Brown, S. 2014. 1.10 - Chemical Analysis Method Statement. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 1 - 1.0 Water column and sedimentary environment. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report629 kb pdf
Preview
Smith, M. 2014. 2.1 - PEP Biodiversity Survey FV Zeearend. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 2 - Fisheries and biodiversity. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report4.2 mb pdf
Preview
5 - Curricula Vitae and Terms of Reference. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 5 - Curricula Vitae and Terms of Reference. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.89 mb pdf
Preview
Volume 2, Appendices: Contents. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report1.64 mb pdf
Preview
Mafwila, S. 2014. Part 2 - Independent review of the NMP Verification Programme Process. Independent Peer Reviews - Verification Studies, Sandpiper Project, pages 52-75. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.24 mb pdf
Preview
Part 3 - Appendices. Independent Peer Reviews - Verification Studies, Sandpiper Project, pages 76-94. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report1.13 mb pdf
Preview
Midgley, J. 2014. Environmental Management Plan. Sandpiper Project, SP-1 Target Area - Licence Area ML 170. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report11.54 mb pdf
Preview
Namibian Marine Phosphate (Pty) Ltd. 2011. The Sandpiper Phosphate Project, Namibia
  » More info & related results
2011 Presentation2.74 mb pdf
Preview
Gibbons, M. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Appendix 1d: Marine Benthic Specialist Study for a Proposed Development of Phosphate Deposits in the Sandpiper Phosphate Licence Area off the Coast of Central Namibia - Jellyfish
  » More info & related results
2011 Report1.56 mb pdf
Preview
Midgley, J. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Chapter 6 - Public consultation
  » More info & related results
2012 Report749 kb pdf
Preview
Midgley, J. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Chapter 8 - Environmental management plan
  » More info & related results
2012 Report919 kb pdf
Preview
Brown, C.J. 1990. Potential impacts of prospecting and mining in desert environments. In: Environmental implications of prospecting and mining in the Namib. Geological Society of Namibia / Desert Ecological Research Unit of Namibia, Windhoek, pp. 12-13
  » More info & related results
1990 Book, Book Section, Booklet
Environmental Law Alliance Worldwide (ELAW). 2010. Guidebook for Evaluating Mining Project EIAs, 1st Edition, July 2010
  » More info & related results
2010 Book, Book Section, Booklet3.16 mb pdf
Preview

» Links to useful free software for working with shapefiles, kml and kmz files, pdf files and more.