More information:

North River Resources. 2016. Project update and latest Namib resource drilling results: high grade hits including an intersection of 57.1 metres (true width 8.5 metres) at 28.6% zinc


Description:

Project update and latest Namib resource drilling results: high grade hits including an intersection of 57.1 metres (true width 8.5 metres) at 28.6% zinc.

Summary / Notes:

Project update and latest Namib resource drilling results: high grade hits including an intersection of 57.1 metres (true width 8.5 metres) at 28.6% zinc.

Year: 2016

Type: Report

Download: 2016_03_18_NRRP drilling update_final_v2.pdf (1.41 mb)

Preview: Preview this file


Top 50 related results:

You may also be interested in the following items which are on a similar or related topic, listed in order of similarity.

Results per page:

Results: 1 to 50 of 50

To FILTER: Use the pale green row to filter the results on this page. Type in text or select from the year list.

Rows matching filter(s): All
What is this row? 
Data titleYearOriginFile typeDownloadkml/kmz
North River Resources. 2016. Project update and latest Namib resource drilling results: high grade hits including an intersection of 57.1 metres (true width 8.5 metres) at 28.6% zinc
  » More info & related results
2016 Report1.41 mb pdf
Preview
Arfè, G., Boni, M., Balassone, G., Mondillo, N., Hinder, G. and Joachimski, M. 2017. New C - O isotopic data on supergene minerals from the Skorpion and Rosh Pinah ore deposits (Namibia): Genetic and paleoclimatic constraints. Journal of African Earth Sciences, 126: 148–158
  » More info & related results
2017 Journal Article
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Chapters 4-10
  » More info & related results
2009 Report14.55 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix B: Public involvement database
  » More info & related results
2009 Report123 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section B - Management and Mitigation Plans (MMPS)
  » More info & related results
2009 Report1.51 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section C - Monitoring Plan
  » More info & related results
2009 Report821 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich
  » More info & related results
2009 Report92 kb pdf
Preview
Bannerman Resources. 2012. Etango Uranium Project Definitive Feasibility Study April 2012
  » More info & related results
2012 Report1.6 mb pdf
Preview
Bannerman Resources. 2012. Etango Uranium Project, Namibia Feasibility Study - National Instrument 43-101 Technical Report
  » More info & related results
2012 Report7.27 mb pdf
Preview
Idaho National Laboratory. 2013. Environmental Impacts, Health and Safety Impacts, and Financial Costs of the Front-End of the Nuclear Fuel Cycle, July 2013
  » More info & related results
2013 Report3.52 mb pdf
Preview
Loots, S. 2011. National conservation assessment and management of two Namibian succulents with specific reference to the Rössing Uranium Mine. Report on a partnership project between the National Botanical Research Institute of Namibia, Rössing Uranium Limited, the Rio Tinto Group and the Royal Botanic Gardens, Kew
  » More info & related results
2011 Report7.91 mb pdf
Preview
Puritch, E., Routledge, R., Sutcliffe, R., Burga, D. and Hayden, A. 2014. Technical report and resource estimate on the Kombat Copper Project, Grootfontein District, Otjozondjupa Region, Namibia, Latitude 19°42’35"S Longitude 17°42’09"E UTM Zone 33K 783301 m E 7818395 m S for Kombat Copper Inc
  » More info & related results
2014 Report3.03 mb pdf
Preview
Swakop Vision. 2011. Swakop Vision - News for the friends and people of Swakop Uranium, October 2011
  » More info & related results
2011 Book, Book Section, Booklet2.35 mb pdf
Preview
Softchem. 2013. Scoping report for the Ongolo Project, public access report
  » More info & related results
2013 Report3.88 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D6: Marine ecology impact assessment - Marine Ecology Specialist Study
  » More info & related results
2014 Report3.49 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D5: Avifauna impact assessment - Specialist assessment report: Birds
  » More info & related results
2014 Report3.06 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D4: Noise impact assessment - Noise Impact Assessment for Rössing Uranium's Proposed Desalination Plant near Swakopmund - Environmental Noise Impact Assessment
  » More info & related results
2014 Report4.74 mb pdf
Preview
Reptile Uranium Namibia - Omahola Project
  » More info & related results
2013 Poster1.27 mb pdf
Preview
Softchem. 2010. Addendum to scoping report for the Omahola Project. Report no. RUNSCOREP/2010/02, 30 November 2010, Addendum to report RUNSCOREP/2010/01
  » More info & related results
2010 Report3.28 mb pdf
Preview
SAIEA. 2009. Trekkopje Uranium Project - Environmental and social impact assessment
  » More info & related results
2009 Report2.12 mb pdf
Preview
Rössing Uranium Limited - Working for Namibia: Report to Stakeholders 2014 - Making progress
  » More info & related results
2014 Report
Kohrs, B. and Kafuka, P. 2014. Study on low-level radiation of Rio Tinto's Rössing Uranium mine workers. EJOLT and Earthlife Namibia Report
  » More info & related results
2014 Report582 kb pdf
Preview
von Oertzen, G. 2015. Risk assessment on Rössing Uranium mine's tailings dust (technical report)
  » More info & related results
2015 Report4.64 mb pdf
Preview
von Oertzen, G. 2015. Rössing Uranium mine's tailings dust: What is the risk?
  » More info & related results
2015 Report5.22 mb pdf
Preview
Boulamanti, A. and Moya, J.A. 2016. Production costs of the non-ferrous metals in the EU and other countries: Copper and zinc. Resources Policy, 49: 112-118
  » More info & related results
2016 Journal Article
Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Environmental Managment Plan Draft Addendum 2016. Dredging of marine phosphate from target area SP-1 in ML 170
  » More info & related results
2016 Report170 kb pdf
Preview
Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report9.87 mb pdf
Preview
van Ballegooyen, R.C. 2014. Review: The utility of hydrodynamic and biochemical numerical modelling to better inform potential water column and benthic impacts of proposed dredging of marine phosphates in Mining Licence Area ML 170, Namibia. CSIR Report. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.28 mb pdf
Preview
Kirby, B. 2014. Specialist Study, Section C2.3 - Thiobacteria. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report333 kb pdf
Preview
Carter, R. and Munnik, K. 2014. Specialist Study, Section C2.1 - Water Column and Sediments. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report12.68 mb pdf
Preview
Glossary. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section C: Specialist Studies. Volume 1, Main Report. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report599 kb pdf
Preview
Metocean Services International. 2014. 1.8 - Instrument Mooring Report: Day 0 to 45. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 1 - 1.0 Water column and sedimentary environment. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.98 mb pdf
Preview
Metocean Services International. 2014. 1.9 - Instrument Mooring Report: Day 45 to 90. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 1 - 1.0 Water column and sedimentary environment. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report4.49 mb pdf
Preview
5 - Curricula Vitae and Terms of Reference. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 5 - Curricula Vitae and Terms of Reference. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.89 mb pdf
Preview
Mafwila, S. 2014. Part 2 - Independent review of the NMP Verification Programme Process. Independent Peer Reviews - Verification Studies, Sandpiper Project, pages 52-75. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report2.24 mb pdf
Preview
Part 3 - Appendices. Independent Peer Reviews - Verification Studies, Sandpiper Project, pages 76-94. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report1.13 mb pdf
Preview
Midgley, J. 2014. Environmental Management Plan. Sandpiper Project, SP-1 Target Area - Licence Area ML 170. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report11.54 mb pdf
Preview
Namibian Marine Phosphate (Pty) Ltd. 2011. The Sandpiper Phosphate Project, Namibia
  » More info & related results
2011 Presentation2.74 mb pdf
Preview
Midgley, J. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Chapter 6 - Public consultation
  » More info & related results
2012 Report749 kb pdf
Preview
Midgley, J. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Chapter 8 - Environmental management plan
  » More info & related results
2012 Report919 kb pdf
Preview
CoM, NCE, MME, MET, DEA and Industry Experts. 2017. Code of Environmental Best Practice for Mining and Minerals Industry Namibia. Draft Contents Page. Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Report43 kb docx
Namdeb. 2017. Environmental Management at Namdeb. Presentation at Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Presentation19.21 mb ppt
Preview
Rio Tinto. 2017. Environmental Management at Rössing Uranium. Presentation at Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Presentation17.33 mb pptx
B2Gold. 2017. Environmental Management - Otjikoto Gold Mine. Presentation at Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Presentation4.4 mb pptx
Weatherly Mining Namibia. 2017. Tschudi Copper Mine. Presentation at Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Presentation12.77 mb pptx
Walvis Bay Salt Holdings. 2017. Walvis Bay SH. Presentation at Mining and Environment Workshop, June 2017
  » More info & related results
2017Mining and Environment Workshop June 2017Presentation3.5 mb pptx
B2Gold Namibia. 2016. Otjikoto Gold Mine: Hazardous waste management plan - June 2016
  » More info & related results
2016 Report1.36 mb pdf
Preview
Mapani, B.S., Uugulu, S., Hahn, R.L., Ellmies, R., Mwananawa, N., Amaambo, W. and Schneider, G. 2011. Results of urine and blood from residents around the Copper Smelter Complex, Tsumeb, Namibia: An example of anthropogenic contamination. In: Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011, pp 48-50
  » More info & related results
2011 Report1.14 mb pdf
Preview
Ndalulilwa, K., Haidula, A., Leonard, R. and Ellmies, R. 2011. Risk assessment of abandoned mine sites in Namibia. In: Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011, pp 52-53
  » More info & related results
2011 Report186 kb pdf
Preview
Kribek, B. (ed). 2011. Mining and the environment in Africa: Proceedings of the inaugural workshop, IGCP/SIDA No. 594, Kitwe/Zambia, October 17th-18th, 2011
  » More info & related results
2011 Report9.21 mb pdf
Preview

» Links to useful free software for working with shapefiles, kml and kmz files, pdf files and more.