More information:

DMC-CSIR. 2010. Environmental Management Plan. In: DMC-DMC CSIR .2010. EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Specialist Reports: Final Environmental Impact Report and Environmental Management Plan. CSIR/CAS/EMS/ER/2009/0029/B. Stellenbosch. Prepared for Namibian Ports Authority


Description:

Environmental Management Plan.

Summary / Notes:

The Environmental Management Plan (EMP) aims to provide a logical, systematic and 'user-friendly' approach to implementing the EIA recommendations, in order to mitigate and manage the potential environmental impacts associated with the construction phase and operational of the proposed new container terminal. All measures for mitigation of impacts that were identified during the EIA are incorporated, thus ensuring that the project does not deviate from the environmental profile that formed the basis of the assessment. The EMP is also intended to ensure that any conditions attached to the Environmental Clearance are met, and provides a clear and auditable indication as to how thosernrequirements should be implemented during project execution.

Year: 2010

Type: Report

Download: Part B_Environmental Management Plan.pdf (891 kb)

Preview: Preview this file


Top 50 related results:

You may also be interested in the following items which are on a similar or related topic, listed in order of similarity.

Results per page:

Results: 1 to 50 of 50

To FILTER: Use the pale green row to filter the results on this page. Type in text or select from the year list.

Rows matching filter(s): All
What is this row? 
Data titleYearOriginFile typeDownloadkml/kmz
DMC-CSIR. 2009. EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Final Scoping Report. 115 pp. CSIR/CAS/EMS/ER/2009/0017/A. Stellenbosch. With Summary and Appendices, prepared for Namibian Ports Authority
  » More info & related results
2010 Report2.45 mb pdf
Preview
SSI. 2009. Traffic and roads impact study for proposed extension of the Walvisbay Container Terminal, Final Report, 30 November 2009. In: DMC-CSIR .2010. EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Specialist Reports: Final Environmental Impact Report and Environmental Management Plan. CSIR/CAS/EMS/ER/2009/0029/B. Stellenbosch. Prepared for Namibian Ports Authority
  » More info & related results
2009 Report1.28 mb pdf
Preview
Safetech. 2009. Specialist study on noise impact. In: DMC-CSIR .2010. EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Specialist Reports: Final Environmental Impact Report and Environmental Management Plan. CSIR/CAS/EMS/ER/2009/0029/B. Stellenbosch. Prepared for Namibian Ports Authority
  » More info & related results
2010 Report729 kb pdf
Preview
OLRAC. 2009. Specialist Study: Marine Ecology Impact Assessment. In: DMC-CSIR .2010. EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Specialist Reports: Final Environmental Impact Report and Environmental Management Plan. CSIR/CAS/EMS/ER/2009/0029/B. Stellenbosch. Prepared for Namibian Ports Authority
  » More info & related results
2009 Report6.54 mb pdf
Preview
Enviro Dynamics. 2010. Social Impact Assessment. In: DMC-CSIR .2010. EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Specialist Reports: Final Environmental Impact Report and Environmental Management Plan. CSIR/CAS/EMS/ER/2009/0029/B. Stellenbosch. Prepared for Namibian Ports Authority
  » More info & related results
2010 Report6.05 mb pdf
Preview
DMC-CSIR. 2009. Hydrodynamic Modelling Report. In: DMC-CSIR .2010. EIA Study for Strategic Expansion of the Walvis Bay Container Terminal. Specialist Reports: Final Environmental Impact Report and Environmental Management Plan. CSIR/CAS/EMS/ER/2009/0029/B. Stellenbosch. Prepared for Namibian Ports Authority
  » More info & related results
2009 Report17.79 mb pdf
Preview
NAMPORT. Environmental Impact Assessment of proposed strategic expansion of the container terminal at the port of Walvis Bay
  » More info & related results
2019 Website
Coastal profile of the Erongo Region
  » More info & related results
1999 Report1.34 mb pdf
Preview
Namibian Coast Conservation and Management (NACOMA) Project review of existing institutional mandates, policies and laws relating to coastal management, and proposals for change
  » More info & related results
2007 Report792 kb pdf
Preview
Namibian Coastal/Marine Bird Action Plan. Proceedings of a workshop on 1 April 2008 at Swakopmund
  » More info & related results
2008 Report8.56 mb pdf
Preview
Schumann, C. 2000. Environmental Review of the Green Plan and Inclusion of Environmental and Sustainable Development Aspects within Namibia's Second National Development Plan (DNPII) - Review of Namibia's Green Plan
  » More info & related results
2000 Report5.82 mb pdf
Preview
Serigstad, B. 2014. Marine and Coastal Management Sharing - Norway's Experience from Coexistence Between Fisheries and Other Users of the Sea, Namibia Phosphate Mining June 2014
  » More info & related results
2014 Report5.93 mb pdf
Preview
University of Namibia Central Consultancy Bureau (UCCB). 2011. Environmental Impact Assessment for the Kuiseb delta and dune belt area. Ministry of Environment and Tourism, Directorate of Environmental Affairs, Namibian Coast Conservation and Management (NACOMA)
  » More info & related results
2011 Report2.25 mb pdf
Preview
Risk-Based Solutions (RBS). 2012. Environmental Management Plan (EMP) Vol. 3 of 3 Report for the Kuiseb Delta and Dune Belt Areas for the NACOMA Project covering Walvis Bay in the Erongo Region Namibia, Windhoek, Namibia
  » More info & related results
2012 Report916 kb pdf
Preview
Skov, H., Bloch, R., Stuer-Lauridsen, F. and Uushona, D. 2009. Strategic Environmental Assessment (SEA) for the coastal areas of the Karas and Hardap Regions
  » More info & related results
2009 Report6.48 mb pdf
Preview
Ministry of Environment and Tourism. 2008. Strategic Environmental Assessment (SEA) for the coastal areas of the Karas and Hardap Regions. Summary of the Study Report
  » More info & related results
2008 Report1.61 mb pdf
Preview
Ministry of Environment and Tourism. 2012. Strategic Environmental Assessment (SEA) for the coastal areas of the Erongo and Kunene Regions. Study Report. Namibian Coast Conservation and Management Project, NACOMA
  » More info & related results
2012 Report17.74 mb pdf
Preview
Skov, H., Bloch, R., Stuer-Lauridsen, F. and Uushona, D. 2007. Strategic Environmental Assessment (SEA) for the coastal areas of the Erongo and Kunene Regions. DHI - Water, environment, health. December 2007
  » More info & related results
2007 Report43.4 mb pdf
Preview
Ministry of Environment and Tourism. 2008. Strategic Environmental Assessment (SEA) for the coastal areas of the Erongo and Kunene Regions. Study Report. Namibian Coast Conservation and Management Project, NACOMA
  » More info & related results
2008 Report3.63 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section A - Introduction and Environmental Management Framework
  » More info & related results
2009 Report3.26 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section B - Management and Mitigation Plans (MMPS)
  » More info & related results
2009 Report1.51 mb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Section C - Monitoring Plan
  » More info & related results
2009 Report821 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Appendix Q: Environmental Management Plan - August 2009, Draft: Langer Heinrich Uranium Environmental Management Plan Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich
  » More info & related results
2009 Report92 kb pdf
Preview
Metago Environmental Engineers. 2009. Environmental Impact Assessment report for the proposed expansion project at Langer Heinrich Mine. Prepared for: Langer Heinrich Uranium (Pty) Limited. Metago Project Number: L016-01, Report No. 2, August 2009 - Executive Summary
  » More info & related results
2009 Report294 kb pdf
Preview
Final Environmental Impact Assessment Report Sand Rose Investments (Pty) Ltd - Establishment of the Namibia International Convention and Exhibition Centre: Desert Rose
  » More info & related results
2015 Report5.16 mb pdf
Preview
Steffani, N. 2008. Marine baseline study on the potential impacts of a seawater intake structure and a brine disposal system for a proposed desalination plant north of Swakopmund. Draft
  » More info & related results
2008 Report14.94 mb doc
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure E: Final Social and Environmental Management Plan
  » More info & related results
2014 Report4.48 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D8: Shoreline dynamics study - Beach and Shoreline Dynamics Specialist Study and Impact Assessment
  » More info & related results
2014 Report1.7 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D5: Avifauna impact assessment - Specialist assessment report: Birds
  » More info & related results
2014 Report3.06 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D4: Noise impact assessment - Noise Impact Assessment for Rössing Uranium's Proposed Desalination Plant near Swakopmund - Environmental Noise Impact Assessment
  » More info & related results
2014 Report4.74 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D3: Visual impact Assessment - Specialist report
  » More info & related results
2014 Report3.07 mb pdf
Preview
Aurecon and SLR. 2014. Social and Environmental Impact Assessment for the Proposed Rössing Uranium Desalination Plant, near Swakopmund, Namibia: Annexure D2: Archaeological impact assessment: Proposed Rössing Uranium desalination plant
  » More info & related results
2014 Report293 kb pdf
Preview
African Conservation Services cc. 2015. Social and Environmental Impact Assessment for Rössing Uranium's Proposed Desalination Plant near Swakopmund: Baseline Report: Bird assessment - Additional study: Monitoring of Damara Terns at Mile 4 Salt Works, summer 2014/2015
  » More info & related results
2015 Report1.36 mb pdf
Preview
EEAN. 1998. Möwe bay fishing port study review of draft PEIA
  » More info & related results
1998DRFN DLIBReport4.07 mb pdf
Preview
Midgley, J. 2014. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Section A: Verification Programme. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report1.62 mb pdf
Preview
van Rooyen, C. 2009. Environmental Impact Assessment (EIA) for the proposed desalination plant at Mile 6, Swakopmund - Bird Impact Assessment Study
  » More info & related results
2009 Presentation13.54 mb ppt
Preview
B2Gold Namibia. 2016. Otjikoto Gold Mine: Hazardous waste management plan - June 2016
  » More info & related results
2016 Report1.36 mb pdf
Preview
Strategic Expansion of the Walvis Bay Container Terminal Project, Namibia: Executive summary of the Environmental and Social assessment. Project Number: P-NA-DD0-002
  » More info & related results
 Report572 kb pdf
Preview
Bendsen, H. 2002. The dynamics of the land use systems in Ngamiland: Changing livelihood options and strategies. Unpublished Report, Harry Oppenheimer Okavango Research Centre, Maun
  » More info & related results
2002Bibliography compiled for Okavango River: The flow of a lifeline.Report1.34 mb pdf
Preview
Enviro Dynamics. 2006. Proposed railway line from Katima Mulilo to Cape Fria / Angra Fria, Namibia. Preliminary Environmental and Social Assessment
  » More info & related results
2006 Report5.56 mb zip
Tweddle, D. and Hay, C. 2009. Management Plan for the Caprivi Floodplain Fisheries with particular reference to the activities of the Zambezi/Chobe Fisheries Project during 2010 to 2012. Integrated Management of Zambezi/Chobe River System - Transboundary Fishery Resource, Namibia/Zambia/Botswana. Field Document no. MFMR/NNF/WWF/Phase I/2
  » More info & related results
2009 Report2 mb pdf
Preview
O'Toole, M.J. 1997. Marine environmental threats in Namibia. Research Discussion Paper No 23, Directorate of Environmental Affairs, Ministry of Environment and Tourism, Namibia
  » More info & related results
1997 Research Discussion Paper3.78 mb pdf
Preview
Wolski, P. and Murray-Hudson, M. 2005. Simulations of effects of development and climate change scenarios on hydro-ecology of the Okavango Delta. Harry Oppenheimer Okavango Research Centre, University of Botswana
  » More info & related results
2005 Report2.25 mb pdf
Preview
Joubert, D., Zimmermann, I., Fendler, J., Winschiers-Theophilus, H., Graz, F.P., Smit, N. and Hoffman, M.T. 2014. The development of an expert system for arid rangeland management in central Namibia with emphasis on bush thickening. African Journal of Range and Forage Science, 31(2): 161–172
  » More info & related results
2014 Journal Article
Environmental Impact Assessment Process for the proposed photovoltaic (Solar) energy facilities in Mariental, Omaruru and Okahandja. General Environmental Specification for Construction
  » More info & related results
NamPowerReport191 kb pdf
Preview
Namibia Coastal/Marine Bird News, 2. Newsletter of the Namibia Coastal/Marine Bird Working Group, June 2008
  » More info & related results
2008 Report756 kb pdf
Preview
J. Midgley and Associates. 2012. Environmental Impact Assessment Report: Dredging of marine phosphates from Ml 170 - Comments and responses trail, Appendix 5: The Dredging of marine phosphate enriched sediments from Mining Licence Area No. 170, Final Report
  » More info & related results
2012 Report15.43 mb pdf
Preview
Munnik, K. and Carter, R. 2014. 1.6 - Gravity Core: Analysis Requirements. Sandpiper Project: Verification Programme Report: Mining Licence Area no. 170. Volume 2, Section D - Appendices: Appendix 1 - 1.0 Water column and sedimentary environment. Namibian Marine Phosphate (Pty) Ltd
  » More info & related results
2014 Report206 kb pdf
Preview
Midgley, J. 2012. Sandpiper Project - Environmental Impact Assessment for the proposed dredging of phosphate enriched sediments from Marine Licence Area No. 170. Chapter 5 - Socio-economics
  » More info & related results
2012 Report636 kb pdf
Preview
Hauptfleisch, M. and Urban, S. 2017. Working towards a fence free Namib landscape. Roan News, 1: 46-49. Namibia Environment and Wildlife Society
  » More info & related results
2017 Report

» Links to useful free software for working with shapefiles, kml and kmz files, pdf files and more.